国产乱妇无乱码大黄aa片,中国女人内谢69XXXX免费视频,国产二级一片内射视频播放,国产精品丝袜黑色高跟鞋

信息詳情

當(dāng)前位置: 首頁 > 氣浮機(jī)的安裝調(diào)試

氣浮機(jī)的安裝調(diào)試

  氣浮機(jī)的安裝

  氣浮機(jī)安裝前,必須用混凝土打好地基。也可以架空安裝,但基礎(chǔ)必須能承擔(dān)設(shè)備運(yùn)行時(shí)的重量(箱體內(nèi)注滿水的重量)。設(shè)備位后需要找水平氣浮機(jī)需設(shè)清洗用下水道,也可以直接采用管道接至調(diào)節(jié)池,以便沖洗氣浮池的水排出。廢水進(jìn)口與反應(yīng)池之間的連接管道,要越短越好,以免絮凝體在管道中被破壞。清水出口可連接清水池,也可直接與下道處理設(shè)備相接。懸浮物出口可接至污泥濃縮池或帶式壓濾機(jī)經(jīng)污泥脫水機(jī)處理。電器箱一般應(yīng)放置在扶梯側(cè)面加防護(hù)防雨裝置。

  氣浮機(jī)的調(diào)試

  氣浮機(jī)試前,應(yīng)做好以下準(zhǔn)備工作:1、要清洗水池內(nèi)所有的雜質(zhì)、焊渣。2、對水泵及空壓機(jī)等需要潤滑部位進(jìn)行加油潤滑。3、接通電源,啟動(dòng)溶氣泵,檢查轉(zhuǎn)向是否與箭頭所標(biāo)方向一致。用手動(dòng)控制啟動(dòng)空壓機(jī),檢查空壓機(jī)運(yùn)轉(zhuǎn)是否正常,發(fā)現(xiàn)異常情況應(yīng)及時(shí)查清原因。4、按下桁車式刮渣機(jī)開關(guān)。運(yùn)行到對后在行程撞塊作用下,刮渣機(jī)面反向行走,直到污泥槽,行程撞塊將刮板翻起,按下停止按鈕,停止刮沫。5、調(diào)節(jié)加藥裝置到佳狀態(tài)使污水與懸浮物分離,以上簡單介紹了氣浮機(jī)的安裝與調(diào)試下篇文章介紹氣浮機(jī)的運(yùn)行。氣浮機(jī)調(diào)試與安裝氣浮機(jī)的一些注意注意事項(xiàng)。

 

我公司專業(yè)生產(chǎn)銷售氣浮機(jī)刮吸泥機(jī)氣浮氣浮設(shè)備砂濾罐本文由www.wxwoma.com提供

 The installation of air flotation machine

Air flotation machine before installation, must lay a foundation in concrete. Also can be installed overhead, but base must be able to bear the weight of the equipment run time (the weight of the casing filled with water). Equipment in place after the need to find a level of the need for clean air flotation machine with the sewer, also can be directly use pipe connected to adjust pool, in order to flush air flotation pool of water. Import the connection between the pipe and reaction pool, waste water should be as short as possible, lest the flocculation body destruction in the pipeline. Water outlet can connect clear water reserviors, also can be directly into the next processing equipment. Suspended exports can connect to the sludge concentration pool or belt type filter press sludge dewatering machine processing. The electrical box should be generally placed in add protective rain gear on the side of the escalator.

Air flotation machine debugging

Air flotation machine to try before, should make preparations for the following: 1, to clean all the impurities, welding slag pool. 2, the water pump and air compressor lubrication part need for lubrication. 3, connected to the power supply, start the dissolved air pump, and check whether in line with the arrow direction. Use manual control to start the air compressor, check whether the compressor running normally, found the abnormal situation should be timely find out the reason. 4, press the girder vehicle type sludge scraper switch. Run to, under the action of the collision block the trip after scraping the slag machine surface reverse to walk, until the sludge tank, schedule collision block up the scraper at, press the stop button, stop blowing foam. 5, adjust the dosing device to best make sewage and separation of suspended solids, the above simple introduced the air floating machine installation and debugging next article introduces the operation of air flotation machine. Air flotation machine debugging and installation of air floatation machine attention some matters needing attention.

我們會(huì)認(rèn)真查閱您反饋的每一個(gè)問題,并盡快給您答復(fù),在這里您可以提出遇到的問題,也可以發(fā)表自己的建議和想法。

問題與建議描述:
為了讓您盡快得到反饋,請留下您的聯(lián)系方式:
驗(yàn)證碼: